A strong landscape design starts with a clear understanding of the property. Before choosing pavers, placing a pool, or designing an outdoor kitchen, the design team needs to know what exists, what the homeowner wants, and what could affect the layout.

A landscape design intake checklist helps contractors collect that information in a consistent way. It gives designers a clearer starting point and helps reduce revisions caused by missing details.

Use the checklist below before submitting your next project. Gather the basics for every job, then add more detailed information when the scope involves slopes, pools, retaining walls, or other complex features.


1. Confirm the Project Scope and Basic Details

Start with a short project summary that anyone on the design team can understand. Include:

  • Project address: The complete address and the areas being designed.
  • Primary contact: The contractor or team member responsible for questions and feedback.
  • Project scope: Backyard renovation, front entry, pool area, planting update, or another clearly defined scope.
  • Requested deliverables: 3D designs, presentation images, video, 2D plans, or the agreed combination.
  • Target dates: The desired presentation date, anticipated construction timing, and any important deadlines.

Identify whether the home and outdoor features already exist, are under construction, or are planned for the future. A proposed home addition can change the entire backyard layout. Include it in the brief even if construction has not started.

2. Take Photos That Explain the Whole Property

Good landscape design photos help the team understand how the spaces connect. Start with wide views, then capture details that could influence the design.

Include clear images of:

  • The project area from each accessible corner.
  • The house faces the project area, including doors, windows, columns, and roof overhangs.
  • Views looking outward from the main doors, patio, and important windows.
  • Existing patios, decks, walkways, walls, trees, and planting beds.
  • Side yards, gates, and the route used to reach the work area.
  • Utility equipment, drains, downspouts, steps, and visible problem areas.
  • Views from the property that affect privacy or should be preserved.

Take close-ups of anything that is difficult to understand in a wide photo. A step, raised threshold, or tight corner can be easy to miss.

Use clear original images, avoid filters, and label the location or direction when it is unclear. A short walkthrough video can explain how the areas connect and highlight homeowner concerns. Photos and video provide context. Record actual dimensions separately.

3. Record Measurements on a Labeled Site Sketch

Measurements are most useful when the designer can see exactly where they were taken.

A basic site sketch should connect the house, existing features, and measured distances. University of Georgia Extension recommends recording the building footprint, openings, fixed equipment, and existing landscape features on a base map.

Measurements to Collect

Record the dimensions relevant to your project, including:

  • House walls, corners, and offsets facing the design area.
  • Door and window locations measured from identifiable corners.
  • Existing patios, decks, walkways, steps, and planting beds.
  • Distances between the house and fixed features such as walls or tree trunks.
  • Gate openings and the narrowest points along access routes.
  • Columns, equipment pads, and other objects that limit usable space.

Write down the units and label both ends of each measurement. Use consistent reference points and include extra measurements where an irregular shape needs clarification.

Keep existing measurements separate from requested dimensions. Label estimates clearly and identify any dimensions that still need verification.

4. Document Elevations, Slopes, and Drainage

A yard’s width and length only describe part of the site. Changes in height also affect how outdoor spaces connect.

For projects involving level changes, provide measured information about:

  • Door thresholds and their relationship to nearby ground or paving.
  • Existing patio and deck levels.
  • The top and bottom of steps.
  • Retaining walls and major changes in grade.
  • Relevant high points, low points, and sloping areas.

Reference field elevations to one clearly identified benchmark. If a survey provides elevation information, preserve its reference system and explain how any additional field measurements relate to it.

Photos show visible conditions; measured elevations provide the information needed to evaluate level changes. Flag missing elevation data before making design decisions that depend on it.

5. Include Surveys, Property Documents, and Restrictions

Provide the most useful available survey or site plan, along with its date and source. Keep the original file readable and complete. Depending on the project, helpful documents include:

  • A property survey or site plan.
  • House plans and exterior elevations.
  • Available topographic or grading information.
  • Documented easements and setbacks.
  • HOA design requirements.
  • Previously approved plans or planned additions.

Show fences separately from documented property boundaries. Use aerial images for orientation and label any approximate information.

If a survey and field measurements disagree, flag the difference for review. Confirm the applicable restrictions with the relevant authority or association before finalizing affected design elements.

6. Identify Existing Features and Site Conditions

Make it clear what stays, what goes, and what needs further review.

Mark existing features as keep, remove, relocate, or undecided. Apply those labels to relevant trees, planting beds, paving, walls, fences, structures, and equipment.

For planting and outdoor comfort, record sun and shade, wet and dry areas, known soil conditions, wind exposure, and views that need screening. These conditions help guide plant selection and placement.

Also identify known locations of:

  • HVAC units and pool equipment.
  • Electrical panels, meters, and outdoor outlets.
  • Water and gas connections.
  • Irrigation controls and existing irrigation features.
  • Wells, septic components, and overhead or underground utilities.

Label utility information by its source and note what still needs verification. A visible connection does not confirm the route or capacity of the system.

Include access needs for equipment maintenance and construction. A layout should account for how people and equipment will reach the spaces being designed.

7. Capture the Homeowner’s Goals, Budget, and Style

An accurate site record gives the designer the physical starting point. The homeowner’s priorities explain what the finished space needs to accomplish.

Features and Daily Use

Separate essential features from optional additions. Record how the homeowner plans to use the space, including cooking, dining, entertaining, swimming, relaxing, or playing.

Ask about:

  • The number of people who regularly use the yard.
  • Typical gathering sizes.
  • Children, pets, and accessibility needs.
  • Privacy concerns and preferred views.
  • Shade needs and preferred times of use.
  • Maintenance expectations.

Explain the problem behind each request. “Create privacy from the neighboring upstairs window” gives the designer a clearer goal than “add plants along the fence.”

Budget and Project Phases

Include a construction budget range and clarify what it covers. Identify whether demolition, equipment, furnishings, or other major expenses are included.

List priorities if the full wish list exceeds the budget. If the project will be built in phases, explain what belongs in the first phase and what should be planned for later.

Style and Material Preferences

Provide a focused set of inspiration images with a short note about each one. Explain whether the homeowner likes the layout, material, planting style, lighting, or overall atmosphere. Record dislikes too.

Add the contractor’s preferred products, suppliers, and construction details so those preferences are available from the start.

8. Organize the Files Before Submission

Keep the project information together in one clearly named folder or intake submission.

Group the photos, measurement sketch, surveys, project brief, inspiration images, and supporting documents so the design team can find them easily. Use descriptive filenames and identify the latest version of each document.

Check that shared links open correctly and that important notes are written in the brief. A detail mentioned only during a phone call is easy to lose during a handoff. Choose one person to combine homeowner and contractor feedback into a clear set of instructions.

If information is missing, state what is unknown and who will confirm it. This lets the team decide which design work can move forward and which decisions need more information.

Final Landscape Design Intake Checklist

Before sending the project to your designer, confirm that you have:

  • A complete address, defined scope, and primary contact.
  • Photos showing the project area, house, access routes, and relevant details.
  • A labeled measurement sketch with units and reference points.
  • Elevation and drainage information appropriate to the project.
  • Available surveys, plans, and documented restrictions.
  • Clear instructions for existing features that stay or change.
  • A homeowner wish list, budget, and style direction.
  • Organized files with missing or conflicting information clearly flagged.

The goal is a project brief the designer can use with confidence. Focus on clear, relevant information and make uncertainty visible.